Latest Team ZWATT news: Based on the lead times we had from Samox in Taiwan, we planned on shipping the ÿding carbon MTB power meter mid-June at the latest. We incurred a delay of almost 2 months. All of this was delays in Taiwan. We learned a lot and so did they. Hopefully, this is going better in the coming batches as processes are optimized.
So, sorry about the delay, now let’s focus on the good times ahead.
For us, it means vacation-time (#yay), as we postponed vacation till after this first batch was shipped out.
If you need help installing the bottom bracket, YouTube is your friend. Or please support your local bike shop – these guys are having a hard time with all the online shopping, but we all need them when we need them. This could be one of those times 🙂